Kokeb Mesk – Alem Ketema Road Construction Project

The project is an upgrading part of the Addis Ababa – Lemi – Alem Ketema – Degolo – Gashena – Lalibela – Sekota- Agebe – Adawa road.  It is constructed to asphalt concrete surfacing road.

Employer: Ethiopian Roads Authority/Administration

Type of service: Construction supervision and contract administration

Time of service: September 17, 2019 – September 25, 2023

Location: Amhara RS, Ethiopia

Major Scope of the Works

  • Design Review
  • Construction Supervision
  • Contract Administration [FIDIC Red Book based Contract]

Major Features of the Project

  • Construction of 47.7Km long asphalt concrete (DC-6) road
  • Major earthwork and landslide stretches [at least 8 locations along the alignment]
  • Five major (bridge) structures including 100m long Jemma River Bridge
  • Strength evaluation and rehabilitation of two bridges
  • 5.8km long town sections

Special Features

  • Geophysical [refraction + resistivity] and drilling investigation at the land slide prone areas to mitigate and optimize the design at the sections