Four Bridge Projects under Adigrate District Design Project

The project is the condition survey, investigation and design of three bridges along the Woldiay – Alamata – Woldia road and Agbe- Sekota road for rehabilitation.

Employer: Ethiopian Roads Authority/Administration

Type of service: ESIA, Detailed Engineering Design and Tender Document Preparation

Time of service: March 10, 2012 –April 23, 2013

Location: Amhara and Tigray RSs, Ethiopia

Major Scope of the Works

  • Topographic Surveying
  • Material Investigation
  • Bridge Foundations Sub-surface Investigations
  • Detailed Engineering Design
  • Environmental and Social Impact Assessment
  • Engineering Cost Estimating
  • Tender Document Preparation

Key Feature of the Project

  • Design of four bridges /structures
  • Design of approach roads

Special Features of the Project