Five Bridge Projects under Combolcha District Design Project The project is the condition survey, investigation and design of five bridges along the Dessie – Waja – Woldia road, Bati – Mile –Semera road and Dichioto – Elidar road for rehabilitation. Employer: Ethiopian Roads Authority/AdministrationType of service: ESIA, Detailed Engineering Design and Tender Document PreparationTime of service: September 30, 2012-Jan 23, 2014Location: Afar and Amhara RSs, Ethiopia Major Scope of the Works Topographic SurveyingMaterial InvestigationBridge Foundations Sub-surface InvestigationsDetailed Engineering DesignEnvironmental and Social Impact AssessmentEngineering Cost EstimatingTender Document Preparation Key Features of the Project Design of five bridges /structuresDesign of approach roads Special Feature of the Project