Edo - Serofta Road Design Project

The project is a road upgrading project that is designed to asphalt concrete (AC) surfacing.

Employer: Ethiopian Roads Authority/Administration

Type of service: Route Selection, Feasibility Study, ESIA, Detailed Engineering Design, RAP Preparation and Tender Document Preparation

Time of service: July 28, 2016 – March 28, 2017

Location: Oromia RS, Ethiopia

Major Scope of Works

  • Route Selection
  • Topographic Surveying
  • Sub-grade Soil Investigation
  • Construction Material Investigation
  • Feasibility Study
  • Detailed Engineering Design
  • Environmental and Social Impact Assessment
  • Resettlement Action Plan Preparation
  • Right-of-way Obstruction Identification and Marking
  • Engineering Cost Estimating
  • Tender Document Preparation

Key Features of the Project

  • Design of 20.28 Km long asphalt concrete [DC-6] road
  • Predominantly flat terrain
  • Predominantly expansive soil sub-grade
  • No major (bridge) structure
  • 2km of town  and kebele sections

Special Features of the Project