The project is an upgrading the road that connects Bahir Dar town to Tis Esat town. It is constructed to double carriageway asphalt concrete surfacing with segregated bike lane.
Type of service: Construction supervision and contract administration
Time of service: December 16, 2019 – March 13, 2023
Location: Amhara RS, Ethiopia
Major Scope of the Works
Design Review and Approval
Construction Supervision
Contract Administration [FIDIC Orange Book based DB Contract]
Key Features of the Project
Design and construction of 10.6km long traffic lane, bike lane and walkway [34.5m] and 10.6km long traffic lane and bike lane [25.64] double carriageway asphalt concrete (DC-6) road
Design and construction of 4.5km long walkway as a spur road
Design and construction of twin (two) 100m long pedestrian suspension bridge on Abay River
Design and construction of 13.627km (main canal) irrigation system
Two roadway major (bridge) structures
Special Features of the Project
The entire road is a double carriageway urban road with segregated bike lane