Assab Corridor [Mellodoni Junction – Manda – Bure] Road Construction Project

The project upgrading of part of the Addis – Semera – Assab trunk road. It is constructed to a combination of rigid pavement and SUperior PERforming Asphalt PAVement (super-pave) road.  

Employer: Ethiopian Roads Authority/Administration

Type of service: Construction supervision and contract administration

Time of service: December 04, 2020 – To date

Location: Afar RS, Ethiopia

Major Scope of the Works

  • Design Review
  • Construction Supervision
  • Contract Administration [FIDIC Red Book based Contract]

Key Features of the Project

  • Construction of 12.5km rigid pavement and 58km SUperior PERforming Asphalt PAVement (super-pave) road
  • Four major (bridge) structures including 48m Bure River Bridge
  • Flood plain analysis and design at least at three locations (total 1km length)
  • 16km long town and kebele sections

Special Features of the Project

  • Rigid pavement and super-pave flexible pavement