Assab Corridor [Mellodoni Junction – Manda – Bure] Road Construction Project The project upgrading of part of the Addis – Semera – Assab trunk road. It is constructed to a combination of rigid pavement and SUperior PERforming Asphalt PAVement (super-pave) road. Employer: Ethiopian Roads Authority/AdministrationType of service: Construction supervision and contract administrationTime of service: December 04, 2020 – To dateLocation: Afar RS, Ethiopia Major Scope of the Works Design ReviewConstruction SupervisionContract Administration [FIDIC Red Book based Contract] Key Features of the Project Construction of 12.5km rigid pavement and 58km SUperior PERforming Asphalt PAVement (super-pave) roadFour major (bridge) structures including 48m Bure River BridgeFlood plain analysis and design at least at three locations (total 1km length)16km long town and kebele sections Special Features of the Project Rigid pavement and super-pave flexible pavement